CULKIN PLUMBING AND HEATING LTD    Director JEFF CULKIN ACIPHE RP RHP    29B CHANDOS ROAD    WILLESDEN GREEN    LONDON    NW2 4LS   

Gas Safe Reg no 305929    Company No. 07980305    VAT No. GB172932986    D-U-N-S Number: 21-827-8135

Primary Coverage;    NW2 Willesden Green Cricklewood, Childs Hill    NW3 Hampstead, Belsize    NW5 Kentish Town, Camden    NW6 West Hampstead, Kilburn,

Queens Park    NW8 St Johns Wood    NW10 Kensal Rise, Harlesden, Willesden    NW11 Golders Green Hampstead Garden Suburb    W9 Maida Vale    W10 North Kensington, Queens Park    W11

* Commercial Gas Heating and Boilers * Legionella Inspections and Water Treatment. * PAT Testing. * System design and build; including plumbing, heating and gas sizing.* Boiler Repairs and Servicing.* Boiler Installation, G3 Cylinder Installation

* Heating System Servicing.* Mechanical Surveys.* Leak detection, tracing.

Ideal iMini 24 30 Boiler Dimensions and Clearances

December 22, 2016

Ideal iMini 24 30 Boiler Dimensions, services and clearances all dimensions in mm 

Width 395 mm

Dept 278 mm

Height 700 mm

 

 

 

The following minimum clearances must be maintained for operation and servicing. 

Front clearance. The minimum front clearance when built in to a cupboard is 5 mm from the cupboard door but 450 mm overall clearance is still required, with the cupboard door open, to allow for servicing. * 

Bottom clearance. Bottom clearance after installation can be reduced to 5 mm. This must be obtained with an easily removable panel, to enable the consumer to view the system pressure gauge, and to provide the 100 mm clearance required for servicing.

Side clearances. 5 mm each side minimum.

 

Additional space will be required for installation, depending upon site conditions. 

Side and Rear Flue a. Provided that the flue hole is cut accurately, e.g. with a core drill, the flue can be installed from inside the building where wall thicknesses do not exceed 600 mm (24”). 

Where the space into which the boiler is going to be installed is less than the length of flue required the flue must be fitted from the outside. 

Installation from inside ONLY b. 

If a core boring tool is to be used inside the building the space in which the boiler is to be installed must be at least wide enough to accommodate the tool. 

 

The boiler connections are made on the boiler bulkhead fittings. 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

First lets be clear we're talking about wet central heating system common in the UK, Ireland, and northern Europe. Usually gas fired but in rural area...

Central heating; the working principles of Space Heating

December 31, 2016

1/2
Please reload

Recent Posts
Please reload

Archive